Typical sets of equipment for foam concrete production
for
plants with productivity
from
10 to 150 cubic meters of foam concrete blocks per day
Before
starting the foam concrete production line and before making your
order you need to give a definite answer to the following questions:
-
What
sizes of foam concrete blocks are planned to be produced. The dimension
types often different from country to country. When ordering metal
moulds it is important to know the exact dimension type as it will be
impossible to change it afterwards. Though in the same mould you can
produce both building blocks and laster ones. That means that while
producing blocks it is possible to change their thickness but not
length and width. Standard block sizes are:
a.
400x300x200 (100) mm
b.
500x300x200 (100) mm
c.
588x300x200 (100) mm
d.
600x300x200(100) mm
e.
any other sizes are also possible
-
How
many cubic meters of blocks is it planned to produce?
-
How do you plan to keep the cement and sand and
feed the foam-concrete machine with it? There are 2 possible ways-
manually (cement is taken out of the bags and sand is passed by
buckets) and automatically (cement comes from silo and sand from
bunker).
In
the given below table you can see typical sets of equipment for the
plants with different productivity:
|
|
Productivity
from 5 to 30 cub. m. per day
|
Productivity
from 30 to 100 cub. m per day
|
Productivity
from 100 to 150 cub.m. per day
|
|
cement+sand
|
Hand
feed
|
1. cement
silo from 60 to 150 tonne
2.
sand bunker
3.
screw for cement feed
4.
sand conveyor, sand seeding machine
5.
automatic dosing line
|
1. cement
silo from 60 to 150 tonne
2.
sand bunker
3.
screw for cement feed
4.
sand conveyor, sand seeding machine
5.
automatic dosing line
|
|
machine
for foam concrete production
|
Fomm-Prof
1000
|
Fomm-Prof
1000
|
1.
Fomm-Pusk
2.
Cutting machine Prof
|
|
metal
moulds
|
From
5 to 30 pieces of the chosen dimension type
|
From
30 to 100 pieces of the chosen dimension type
|
From
150 to 240 moulds for cutting machine
|
|
additional
equipment
|
1.
Compressor with productivity from 500 litres per minute
2.
Air cleansing system
3.
Water feed and dosation
|
1.
Compressor with productivity from 800 litres per minute
2.
Air cleansing system
3.
Water feed and dosation
|
1.
Compressor with productivity from 800 litres per minute
2.
Air cleansing system
3.
Water feed and dosation
|
|
Additional
requests
|
1.
Premises from 200 to 400 m2
2.
outdoor place for the stock
3.
electricity
4.
water
5.
heating
|
1.
Premises from 400 to 1500 m2
2.
outdoor place for the stock
3.
electricity
4.
water
5.
heating
|
1.
Premises from 1500 to 3000 m2
2.
outdoor place for the stock
3.
electricity
4.
water
5.
heating
|
|
Quantity
of workers
|
From
3 to 15 people, one shift
|
From
15 to 30 people, two shifts
|
From
15 to 20 people, two shifts
|
When
planning the production line the attention should be paid to the
consumption of materials.
Consumption
of materials for foam concrete production:
On
every cubic meter of foam concrete of medium density it is needed:
(the
information is approximate and may change due to the produced density
and production technology):
-
Foam agent GreenFroth — 0,9 litres
-
metal mould lubricant Pieri — 0,4
litres
-
cement M500 D0
— 300 kg
-
sand with fraction up
to 2 mm, clay and other inclusions no more than 2 % - 220 kg
-
water — 170 litres
Below
it is given the averaged table for daily usage of components:
|
|
10
cub. m per day
|
30
cub. m per day
|
50
cub. m per day
|
100
cub. m per day
|
150
cub. m per day
|
|
Cement
|
3 tonne
|
9 tonne
|
15 tonne
|
30 tonne
|
45 tonne
|
|
Sand
|
2,2 tonne
|
6,6 tonne
|
11 tonne
|
22 tonne
|
33 tonne
|
|
Water
|
1700
litres
|
5100
litres
|
8500
litres
|
17000
litres
|
25500
litres
|
|
Foam
agent GreenFroth
|
9
litres
|
27
litres
|
45
litres
|
90
litres
|
135
litres
|
|
Metal
mould lubricant Pieri
|
4
litres
|
12
litres
|
20
litres
|
40
litres
|
60
litres
|
More
detailed information can be required from the specialists of
Stroy-Beton plant. It is also possible to get schemes of equipment
placement both in the existing shop and for the projected one.